How to Conduct Bucket Elevator Test Run: Key Points to Note

Author :


Bucket Elevator Test Run: Essential Precautions

Precautions for No-Load Test Run of the Bucket Elevator

  1. Pay attention to the operation of the bucketstraction chainsand sprocketsThe rotating parts must not collide with or get stuck on other fixed partsThe two chains should run consistentlyand the buckets must not be skewed.
  2. Check whether the oil temperature of all bearings is normal (the temperature should not exceed 65° after two hours of operation) and whether the lubrication and sealing are good.
  3. Check for any abnormal noise from the reducerany oil leakagewhether the coupling is installed reliablywhether the electrical control is normaland whether the no-load power does not exceed 35% of the rated power.
  4. Carefully observe the backstop device and ensure that the motor's running direction is consistent.
  5. Check whether all fasteners are loosePay special attention to the tightening of the bolts fixing the buckets to the chains after stopping.
  6. After the no-load test run is completed and deemed satisfactorya 16-hour load test run should be conducted:that isoperation under the original designed lifting capacity and the conditions of the lifted material.

Precautions for Load Test Run of the Bucket Elevator

  1. The load test run should be conducted under the original designed conveying capacity and the conditions of the material to be conveyedFirstobserve the working condition of the drive unitwhether the current of the electric motor exceeds the rated value under loadwhether the electrical control is normaland the sound characteristics of the reduceretc.
  2. Check the working conditions of the upper and lower assemblieswhether the running speeds of the two chains are synchronizedand whether the buckets meet the requirements.
  3. Under uniform feeding conditionspay attention to the characteristics of material supplyand ensure that there is no material accumulation at the bottom of the elevator.
  4. Observe the filling degree of the conveyed material in the bucketswhether there is a phenomenon of one-sided loadingand measure whether the conveying capacity meets the design requirements.
  5. The elevator should be stopped multiple times to check the function of the backstop devicewhich should ensure that there is no significant reverse movement of the running parts when the elevator stops suddenly.
  6. Only after all the defects found during the load test run have been eliminated and the results are satisfactorycan the elevator be handed over for production.

Bucket Elevator